even
← Back to glossary

PPS-System

Also: PPS, Produktionsplanungssystem, Produktionsplanungs- und -steuerungssystem, Produktionsplanung und -steuerung, PPS-Software, PPS-Lösung

AI-generated

In brief

A PPS system (production planning and control system) plans and controls the entire manufacturing process – from requirements determination through scheduling and capacity planning to order control.

Key facts

What is a PPS system?

A production planning and control system – or PPS system for short – coordinates all planning-relevant processes in manufacturing. It receives orders from sales or the ERP, resolves bills of materials, determines material requirements, plans capacities, and schedules operations. The result is production orders, material requirements, and delivery date commitments that other areas of the business use as a reliable planning basis.

Historically, PPS systems emerged as a distinct software category before ERP platforms absorbed many of their functions. Today, PPS functionality is often found as an integrated module within ERP systems, though it also exists as a specialized solution connected via interfaces – particularly where complex manufacturing environments require deeper planning logic than generic ERP modules provide.

Core functions and how they work in practice

The typical planning cycle of a PPS system comprises several sequential steps:

  • Requirements planning (MRP): From customer orders, forecast data, or inventory levels, the system derives primary requirements and breaks these down via bills of materials into secondary requirements (components, raw materials).
  • Scheduling: Forward scheduling and backward scheduling determine when each operation must start and end on which resource in order to meet the delivery date.
  • Capacity planning: The system matches the determined capacity requirements against available capacities – bottlenecks become visible and must be resolved manually or algorithmically.
  • Order control and confirmations: Released production orders are passed to the shopfloor or MES; confirmations of completed quantities, scrap, and actual times flow back into the PPS.

For intralogistics, the material requirements lists and delivery call-offs generated by the PPS are particularly relevant. They determine when which material must be available at the point of use – and therefore the timing of internal transport, Kanban cycles, and buffer storage.

Distinguishing PPS from MES and ERP

The terms PPS, MES, and ERP are often used loosely in practice. As a rough guide: the ERP manages commercial processes and high-level planning, the PPS system focuses on manufacturing-oriented planning and order control, while the MES controls and monitors production in real time at machine level. In practice, these boundaries blur – some ERP vendors refer to their manufacturing module as a PPS, and some MES systems take on planning functions.

Selection criteria

When selecting a PPS system, you should pay attention to the following points: Does the planning logic suit your manufacturing type (make-to-order, series production, or process manufacturing)? How deeply is it integrated with the existing ERP? Which interfaces to WMS, MES, and data collection systems are available as standard? And how well can the system adapt to revised bills of materials or short-notice capacity adjustments? These questions depend on the vendor and should be clarified as part of a structured requirements definition.

Frequently asked questions

An ERP system covers all core commercial and logistical processes within a company – from financial accounting to warehouse management. A PPS system focuses specifically on the planning and control of manufacturing. In many ERP systems, PPS functionality is included as an integrated module, meaning the boundary between the two is fluid.

Related terms

Matching categories